# Automate construction scheduling and procurement in Google Sheets: n8n workflow

> Started by another system calling it, and works across Gmail, Google Sheets and Slack. 25 steps, 4 branches: large, and worth reading before you trust it...

Source: https://millionrounds.com/workflow/automate-construction-scheduling-and-procurement-in-google-s (Millionrounds; every figure on the page links to its filing or article)

[Automation library](https://millionrounds.com/workflows) · [Scheduling](https://millionrounds.com/workflows?category=Scheduling#library)

# Automate construction scheduling and procurement in Google Sheets

Started by another system calling it, and works across Gmail, Google Sheets and Slack. 25 steps, 4 branches: large, and worth reading before you trust it with anything live.

Large

[Download free](https://millionrounds.com/login?next=%2Fapp%2Fworkflow%2Fautomate-construction-scheduling-and-procurement-in-google-s)

**25 steps** Large: read it before trusting it with anything live

**4** Branches: places the flow splits

**0** Loops or waits

**3** Services it connects to

## The flow

Starts it 3 Logic 7 Service 15

The steps in the order they run, from what starts it.

- 1 **Schedule Trigger (Daily 8AM)** Schedule trigger *Starts it*
- 2 **Webhook (Receive Response)** Webhook *Starts it*
- 3 **Gmail Trigger1** Gmail trigger *Starts it*
- 4 **Google Sheets (Read All Tasks)** Google Sheets *Service*
- 5 **Google Sheets (Read for Mapping)** Google Sheets *Service*
- 6 **IF (Check Subject)** If *Logic*
- 7 **Code (Filter Upcoming Tasks)** Code *Logic*
- 8 **Code (Map Task Dependency)** Code *Logic*
- 9 **Code (Parse Email Content)** Code *Logic*
- 10 **Gmail (Send Status Inquiry)** Gmail *Service*
- 11 **IF (Check for Delay)** If *Logic*
- 12 **IF (Validate Fields)** If *Logic*
- 13 **Google Sheets (Log Delay)** Google Sheets *Service*
- 14 **IF (Check for Early Start)** If *Logic*
- 15 **Gmail (Place Order)** Gmail *Service*
- 16 **Gmail (Send Rejection)** Gmail *Service*
- 17 **Gmail (Notify Next Contractor - Delay)** Gmail *Service*
- 18 **Google Sheets (Log Early Start)** Google Sheets *Service*
- 19 **Google Sheets (Log On-time)** Google Sheets *Service*
- 20 **Google Sheets (Log Orders)** Google Sheets *Service*
- 21 **Slack (Admin Alert - Delay)** Slack *Service*
- 22 **Gmail (Notify Next Contractor - Early)** Gmail *Service*
- 23 **Gmail (Notify Admin - On-time)** Gmail *Service*
- 24 **Gmail (Send Confirmation)** Gmail *Service*
- 25 **Slack (Admin Alert - On-time)** Slack *Service*

## How it's built

- **Starts on:** Another system calling it
- **Steps:** 25, with 4 branches
- **Size:** Large: read it before trusting it with anything live
- **Connects to:** Gmail, Google Sheets, Slack
- **Model:** None. This is plumbing, not judgement

## Questions

What does it need to run?

An n8n account, plus your own Gmail, Google Sheets and Slack accounts. You connect your own accounts after importing it; none are included.

What starts it?

It starts on another system calling it.

Does it use AI?

No. Every step is fixed logic or a call to a service, so it does the same thing every time.

How long does it take to set up?

Take your time. At 25 steps it is large: read it before trusting it with anything live.

How do I import it?

Copy the workflow, open a new workflow in n8n and paste. The steps appear on the canvas, ready for your own accounts.

**Before you run it**

Nothing here has been tested by us. It is somebody's working automation, read and described from its own steps. Treat the connections it wants as a list of accounts it will touch, and read the 25 steps before you point it at anything that matters.

## Run it in n8n

- **Create your n8n account** Free to start. n8n is where the workflow runs. [Create an n8n account ↗](https://millionrounds.com/n8n)
- **Download the workflow** Free with a Millionrounds account. [Download free](https://millionrounds.com/login?next=%2Fapp%2Fworkflow%2Fautomate-construction-scheduling-and-procurement-in-google-s)
- **Paste it into n8n** Open a new workflow in n8n and paste. Then connect your own accounts.

Stored with the author's traces removed: canvas notes, instance identifiers, saved credential names and any live document they had left behind.

## Connects to

Each opens the other workflows that use it.

[Gmail](https://millionrounds.com/workflows?service=Gmail#library)[Google Sheets](https://millionrounds.com/workflows?service=Google+Sheets#library)[Slack](https://millionrounds.com/workflows?service=Slack#library)

## Workflows like it

Also scheduling, with the same services where possible, closest in size first.

- [**Automate subscription renewal reminders with Google Sheets** 25 steps · Google Sheets, Slack](https://millionrounds.com/workflow/automate-subscription-renewal-reminders-with-google-sheets)
- [**Telegram appointment scheduler bot with Google Calendar** 25 steps · Google Calendar, Google Sheets](https://millionrounds.com/workflow/telegram-appointment-scheduler-bot-with-google-calendar)
- [**AI token tracker for WhatsApp & Telegram – Save AI usage** 25 steps · calls a model · Airtable, Gmail](https://millionrounds.com/workflow/ai-token-tracker-for-whatsapp-and-telegram-save-ai-usage)
- [**AI-powered meeting research & daily agenda** 25 steps · calls a model · Gmail, Google Calendar](https://millionrounds.com/workflow/ai-powered-meeting-research-and-daily-agenda)
- [**Automate new customer onboarding with HubSpot** 25 steps · calls a model · Gmail, Google Calendar](https://millionrounds.com/workflow/automate-new-customer-onboarding-with-hubspot)
- [**Automated customer onboarding with HubSpot and Gmail** 25 steps · calls a model · Gmail, Google Calendar](https://millionrounds.com/workflow/automated-customer-onboarding-with-hubspot-and-gmail)
